Contract packing UK | Kitting and assembly | X1 Ltd
Home/What we do/Contract packing & kitting

Contract packing and kitting for networks

We hold your components, build a physically different pack for each site in your network to a specification we maintain with you, check it, and ship it in bulk. Programme pricing, open book. No per-order rate.

What contract packing actually is

Contract packing is paying somebody else to assemble your product into its final, sellable, shippable form.

In practice it means a third party holds your components (printed items, bottles, garments, booklets, promotional stock) and puts them together into finished packs on your instruction. The industry also calls it kitting and assembly, or co-packing. It is not the same as fulfilment: fulfilment picks something that already exists and posts it to a consumer. Contract packing creates the thing that is picked.

The work becomes valuable when the packs are not identical. A distributor network, a school assessment programme, a franchise estate: each destination needs a pack with different contents, a different label, a different language or a different quantity. Somebody has to hold every one of those specifications, build against the right one, and be right every time.

What makes a pack high-mix

Four things push a programme from simple repetition into work that needs a specification per site. Most networks have at least two.

Contents differ

A small site needs a different quantity of consumables than a flagship. The bill of materials changes per site, not per season.

Labels and artwork differ

Variable data print, per-site artwork, site codes, batch numbers. Printed in the same building that packs them, which removes a supplier and a delay.

Language differs

The same product going to twelve countries needs twelve handbooks, twelve label sets and the discipline never to mix them.

Timing differs

Term dates, launch dates, opening dates. A pack that is correct but late is a pack that failed.

Spec explorer

The same shelves. Two very different boxes.

Pick two sites and compare what actually goes in each box. This is the document we maintain for every site in your network.

Site A
{{ leftTitle }}
{{ leftMeta }}
{{ r.item }} {{ r.qty }}
Site B
{{ rightTitle }}
{{ rightMeta }}
{{ r.item }} {{ r.qty }}

{{ diffNote }}

Accuracy is the product

A wrong pack does not cost you the pack. It costs a site visit, a resit, a franchise opening that starts badly. Our process assumes that variation is where mistakes come from, and puts a check at every point where a specification could be misread.

99.999%
delivery success rate across all despatches
First article approval

Before a run starts, one pack is built and signed off against the specification, by you.

Component check at goods-in

Counted, batch-recorded and put away against the stock list, so shortages surface before a build, not during one.

Build to a printed spec sheet

Every bench works from the sheet for that site. No memory, no assumptions from the last one.

Check and weigh before close

A second pair of eyes and a known target weight catch the two most common errors: wrong item, missing item.

Traceability after despatch

What went where, in which batch, on which date, so a query about one site does not become an audit of the programme.

The commercial model

Priced as a programme, not as a parcel

If you ask us for a rate per order, we will decline politely and explain why: a per-order rate hides the work that makes variable packs correct, and the cheapest quote always belongs to whoever understood the job least.

Setup and design

One-off. Specification build per site, artwork, first article approval, bench layout.

Monthly management

A named programme owner, stock reporting, call-off scheduling, spec changes.

Build rate per pack

Set by the specification: components, steps, checks. Reviewed as volumes change.

Storage

Components and finished packs, by pallet or shelf, reported monthly.

Onboarding, step by step

How long the first build takes depends on how many specifications there are and whether new print is needed. After the first call we will give you a timeline with each of these stages on it.

Step 1

Specification workshop

We sit with your team and write down what varies, site by site. Usually the first time it has been documented.

Step 2

Stock in, counted

Components arrive, are counted and put away. Print components go into production here.

Step 3

First articles

One pack per variant type, built and sent to you for sign-off. Nothing runs until they are approved.

Step 4

Pilot build

A live run to a subset of sites, timed, so the build rate is measured rather than estimated.

Step 5

Full run and handover

The network gets its packs, you get the reporting pack and a named programme owner.

Questions buyers actually ask

If yours is not here, ask it on the call. We would rather answer it than have you guess.

{{ f.a }}

Bring us your most awkward pack.

The one with fourteen variants and a term deadline. That is the conversation we are good at.